top of page

The process of generating three building iterations by borrowing aspects of architectural precedents to influence and develop a design strategy

P04 The Big Draw

Iteration 03

SWOT

StrengthWeaknessOpportunityThreat Analysis

First Floor Plan

Level change and connectivity to main features of the site

View from the restaurant is underutilized


Larger traditional theatre space will accommodate for greater audience sizes; suitable for concerts

With a larger volume the façade may dwarf and feel obstructive to the surrounding structures

Edge Ln

Bridgewater Canal

Elevation Parallel to the canal
Public Vs. Private

Semi-public (conditional)

General Public

Private (Staff only)

Programme

Theatre

Dining area

Bar

Canal walkway

Circulation

Toilets

Parking spaces

Foyer/ Reception


Green space

Patio

Programme
Precedents
Precedents

Rehabilitation_VL173 (2016), Cra-de
Restaurant/Bar
Bucharest, Romania

CRADE_02
CRADE_10
Rehabilitation_VL173  crade
06_secciones

De la Farola Marina WHARF ONE (2011), L35
retail & seafront promenade
Malaga, Spain

MAL33
PORTADA_MAL12
De la Farola Marina WHARF ONE  L35
MAL23

Siemens Crystal (2012), Wilkinson Eyre Architects
Exhibition/ Tech and innovation centre
London, UK

stringio4
sc section
sc section big
siemens crystal plan
bottom of page